Planning and scheduling of steel plates production. Part I: Estimation of production times via hybrid Bayesian networks for large domain of discrete variables
Authors:
- Junichi MoriJMJunichi Mori
- Vladimir MahalecVMVladimir Mahalec
- 1 August 2015
- journal article
- research article
- Published by Elsevier in Computers & Chemical Engineering
- Vol. 79, 113-134
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- LEARNING STRUCTURED BAYESIAN NETWORKS: COMBINING ABSTRACTION HIERARCHIES AND TREE-STRUCTURED CONDITIONAL PROBABILITY TABLESComputational Intelligence, 2008
- Approximate probability propagation with mixtures of truncated exponentialsInternational Journal of Approximate Reasoning, 2007
- Cyclic production–inventory planning and control in the pre-Deco industry: A case studyInternational Journal of Production Economics, 2006
- Mathematical modeling and optimization strategies (genetic algorithm and knowledge base) applied to the continuous casting of steelEngineering Applications of Artificial Intelligence, 2003
- A decomposition approach for the scheduling of a steel plant productionComputers & Chemical Engineering, 2001
- A mathematical programming model for scheduling steelmaking-continuous casting productionEuropean Journal of Operational Research, 2000
- Scheduling of the batch annealing process — deterministic caseComputers & Chemical Engineering, 1999
- Propagation of Probabilities, Means, and Variances in Mixed Graphical Association ModelsJournal of the American Statistical Association, 1992
- Graphical Models for Associations between Variables, some of which are Qualitative and some QuantitativeThe Annals of Statistics, 1989
- Future paths for integer programming and links to artificial intelligenceComputers & Operations Research, 1986