Double-controller scheme for controlof processes with dominant delay
Authors:
- 25 September 1998
- journal article
- Published by Institution of Engineering and Technology (IET) in IEE Proceedings - Control Theory and Applications
- Vol. 145 (5) , 479-484
Abstract
A double-controller structure is proposed for control of processes with dominant time delay. In contrast to the Smith predictor, the proposed control scheme contains two controllers, a setpoint controller and a load controller, and a process model. With this structure, the setpoint and load responses of the closed-loop system are no longer coupled, and the two controllers can be separately designed to obtain good performance in both setpoint tracking and load rejections. Any errors resulting from the inevitable mismatch between the model and the process can be viewed as additional load disturbances, and are compensated by the load controller. The load controller is tuned to be insensitive to the model structure and parameters, to accommodate large model uncertainty, for which the standard Smith predictor may give poor regulatory performance and even fail to work. Extensive simulations show that the proposed scheme is superior to the Smith predictor in the presence of large uncertainty in process dynamics.Keywords
This publication has 5 references indexed in Scilit:
- Robust Smith‐predictor controller for uncertain delay systemsAIChE Journal, 1996
- Adaptive predictive control of systems with time‐varying time delayInternational Journal of Adaptive Control and Signal Processing, 1993
- A dual-rate adaptive digital smith predictorAutomatica, 1989
- Smith predictor design for robust performanceInternational Journal of Control, 1987
- A comparison of the Smith predictor and conventional feedback controlChemical Engineering Science, 1976