Reducing the loss of offsite power contribution in the core damage frequency of a VVER-1000 reactor by extending the house load operation period
Authors:
- Massoud MohsendokhtMMMassoud Mohsendokht
- Kamal HadadKHKamal Hadad
- Massoud JabbariMJMassoud Jabbari
- 1 June 2018
- journal article
- research article
- Published by Elsevier in Annals of Nuclear Energy
- Vol. 116, 303-313
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Total loss of AC power analysis for EPR reactorNuclear Engineering and Design, 2015
- Multiphase Flow Dynamics 52015
- Alternative off-site power supply improves nuclear power plant safetyAnnals of Nuclear Energy, 2014
- The safety assessment of OPR-1000 nuclear power plant for station blackout accident applying the combined deterministic and probabilistic procedureNuclear Engineering and Design, 2014
- ESTABLISHMENT OF A MAINTENANCE PROGRAM TO PREVENT LOSS OF OFFSITE POWER IN NUCLEAR POWER PLANTSNuclear Engineering and Technology, 2013
- Study of long-term loss of all AC power supply sources for VVER-1000/V320 in connection with application of new engineering safety features for SAMGAnnals of Nuclear Energy, 2013
- On-site power system reliability of a nuclear power plant after the earthquakeKerntechnik, 2013
- A quantitative evaluation of reliability of passive systems within probabilistic safety assessment framework for VHTRAnnals of Nuclear Energy, 2010
- Application of the fault tree analysis for assessment of power system reliabilityReliability Engineering & System Safety, 2009
- Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Code Reference Manual2008