No-Idle Flow Shop Scheduling with Deteriorating Jobs and Common Due Date Under Dominating Machines
- 29 February 2024
- journal article
- research article
- Published by World Scientific Pub Co Pte Ltd in Asia-Pacific Journal of Operational Research
- Vol. 41 (06)
Abstract
The phenomenon of deterioration effects can reduce production efficiency caused by extended start time or other factors. Based on it, this paper considers the scheduling situations of the common due date assignment in a no-idle flow shop scheduling environment. Under the given four dominating relationships (i.e., increasing, decreasing, increasing-decreasing and decreasing-increasing dominating machines, correspondingly expressed as idm, ddm, idm–ddm and ddm–idm) between machines, the objective functions are, respectively, to minimize (1) the weighted sum of common due date and total earliness; and (2) the weighted sum of common due date, total earliness and total penalty factors of tardy jobs. It is verified that these problems can be solved in polynomial time under four dominating relationships.Keywords
This publication has 36 references indexed in Scilit:
- On optimal due date assignment without restriction and resource allocation in group technology schedulingJournal of Combinatorial Optimization, 2023
- Optimization of scheduling problems with deterioration effects and an optional maintenance activityJournal of Scheduling, 2022
- Rescheduling problems with allowing for the unexpected new jobs arrivalJournal of Combinatorial Optimization, 2021
- The due date assignment scheduling problem with the deteriorating jobs and delivery timeJournal of Applied Mathematics and Computing, 2021
- Due date assignment and two-agent scheduling under multitasking environmentJournal of Combinatorial Optimization, 2020
- Parallel-machine serial-batching scheduling with release times under the effects of position-dependent learning and time-dependent deteriorationAnnals of Operations Research, 2020
- Benders decomposition for the mixed no-idle permutation flowshop scheduling problemJournal of Scheduling, 2020
- Bi-objective hybrid flow shop scheduling with common due dateOperational Research, 2019
- Single-machine serial-batch delivery scheduling with two competing agents and due date assignmentAnnals of Operations Research, 2018
- CON/SLK due date assignment and scheduling on a single machine with two agentsNaval Research Logistics (NRL), 2016