Memory-processor co-scheduling in fixed priority systems
Open Access
- 4 November 2015
- conference paper
- Published by Association for Computing Machinery (ACM)
- p. 87-96
Abstract
International audienceA major obstacle towards the adoption of multi-core platforms for real-time systems is given by the difficulties in characterizing the interference due to memory contention. The simple fact that multiple cores may simultaneously access shared memory and communication resources introduces a significant pessimism in the timing and schedulability analysis. To counter this problem, predictable execution models have been proposed splitting task executions into two consecutive phases: a memory phase in which the required instruction and data are pre-fetched to local memory (M-phase), and an execution phase in which the task is executed with no memory contention (C-phase). Decoupling memory and execution phases not only simplifies the timing analysis, but it also allows a more efficient (and predictable) pipelining of memory and execution phases through proper co-scheduling algorithms.In this paper, we take a further step towards the design of smart co-scheduling algorithms for sporadic real-time tasks complying with the M/C (memory-computation) model. We provide a theoretical framework that aims at tightly characterizing the schedulability improvement obtainable with the adopted M/C task model on a single-core systems. We identify a tight critical instant for M/C tasks scheduled with fixed priority, providing an exact response-time analysis with pseudo-polynomial complexity. We show in our experiments that a significant schedulability improvement may be obtained with respect to classic execution models, placing an important building block towards the design of more efficient partitioned multi-core systemsKeywords
This publication has 36 references indexed in Scilit:
- Holistic analysis of asynchronous real-time transactions with earliest deadline schedulingJournal of Computer and System Sciences, 2007
- On priority assignment in fixed priority schedulingInformation Processing Letters, 2001
- A polynomial time approximation scheme for the two-stage multiprocessor flow shop problemTheoretical Computer Science, 2000
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hardEuropean Journal of Operational Research, 1996
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One StageJournal of the Operational Research Society, 1995
- Holistic schedulability analysis for distributed hard real-time systemsMicroprocessing and Microprogramming, 1994
- Applying new scheduling theory to static priority pre-emptive schedulingSoftware Engineering Journal, 1993
- Finding Response Times in a Real-Time SystemThe Computer Journal, 1986
- Scheduling Algorithms for Multiprogramming in a Hard-Real-Time EnvironmentJournal of the ACM, 1973
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954