In generation expansion planning, reliability level is the key criterion to ensure enough generation above peak demand in case there are any generation outages. This reliability criterion must be appropriately optimized to provide a reliable generation system with a minimum generation cost. Currently, a method to determine an optimal reliability criterion is mainly focused on reserve margin, an accustomed criterion used by several generation utilities. However, Loss of Load Expectation (LOLE) is a more suitable reliability criterion for a generation system with a high proportion of renewable energy since it considers both the probabilistic characteristics of the generation system and the entire load’s profile. Moreover, it is also correlated with the reserve margin. Considering the current fuel supply situation, a probabilistic model based on Bayes’ Theorem is also proposed to incorporate fuel supply unavailability into the probabilistic criterion. This paper proposes a method for determining the optimal LOLE along with a model that incorporates fuel supply unavailability into consideration. This method is tested with Thailand’s Power Development Plan 2018 revision 1 to demonstrate numerical examples. It is found that the optimal LOLE of the test system is 0.7 day/year, or shifted to 0.55 day/year in the case of considering the fuel supply unavailability.Keywords
Funding Information
- Energy Research Institute, Chulalongkorn University
This publication has 29 references indexed in Scilit:
- Coordinated short-term scheduling and long-term expansion planning in microgrids incorporating renewable energy resources and energy storage systemsEnergy, 2017
- Multistage generation expansion planning incorporating large scale energy storage systems and environmental pollutionRenewable Energy, 2016
- MILP model for long-term energy mix planning with consideration of power system reservesApplied Energy, 2016
- A multi-period, multi-regional generation expansion planning model incorporating unit commitment constraintsApplied Energy, 2015
- Cleaner power generation through market-driven generation expansion planning: an agent-based hybrid framework of game theory and Particle Swarm OptimizationJournal of Cleaner Production, 2015
- Multiobjective generation expansion planning considering power system adequacyElectric Power Systems Research, 2013
- Approximate Methods for Event-Based Customer Interruption Cost EvaluationIEEE Transactions on Power Systems, 2005
- Evaluation of reliability worth in an electric power systemReliability Engineering & System Safety, 1994
- A concise method for calculating expected unserved energy in generating system reliability analysisIEEE Transactions on Power Systems, 1991
- Reliability Evaluation of Power Systems1984