Application of an Expert System to Predict Maximum Explosive Charge Used Per Delay in Surface Mining
Authors:
- 7 February 2013
- journal article
- research article
- Published by Springer Nature in Rock Mechanics and Rock Engineering
- Vol. 46 (6) , 1551-1558
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Fuzzy modeling approaches for the prediction of maximum charge per delay in surface miningInternational Journal of Rock Mechanics and Mining Sciences, 2011
- Prediction of blast-induced ground vibration using artificial neural networkInternational Journal of Rock Mechanics and Mining Sciences, 2009
- Evaluation of blast-induced ground vibration predictorsSoil Dynamics and Earthquake Engineering, 2007
- Prediction of blast induced ground vibrations and frequency in opencast mine: A neural network approachJournal of Sound and Vibration, 2006
- Prediction of grindability with multivariable regression and neural network in Chinese coalFuel, 2005
- Application of neural network for the modeling and control of evaporative condenser cooling loadApplied Thermal Engineering, 2005
- Use of backpropagation neural network for landslide monitoring: a case study in the higher HimalayaEngineering Geology, 2004
- Selection of Methodology for Neural Network Modeling of Constitutive Hystereses Behavior of SoilsComputer-Aided Civil and Infrastructure Engineering, 2000
- Strategies and best practice for neural network image classificationInternational Journal of Remote Sensing, 1997
- Suggested method for blast vibration monitoringInternational Journal of Rock Mechanics and Mining Sciences, 1992