Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework
Authors:
- 10 March 2010
- journal article
- research article
- Published by Wiley in International Journal for Numerical Methods in Biomedical Engineering
- Vol. 27 (10) , 1545-1557
Abstract
No abstract availableKeywords
This publication has 31 references indexed in Scilit:
- The effect of service level constraint on EPQ model with random defective rateMathematical Problems in Engineering, 2006
- Numerical method for determination of reworking or scraping the defective items in a finite production rate modelCommunications in Numerical Methods in Engineering, 2005
- Optimal manufacturing batch size with rework process at a single-stage production systemComputers & Industrial Engineering, 2004
- Optimizing inventory decisions in a multi-stage multi-customer supply chainTransportation Research Part E: Logistics and Transportation Review, 2003
- An optimal batch size for a production system operating under periodic delivery policyComputers & Industrial Engineering, 1999
- Minimal repair policies for an economic manufacturing processJournal of Quality in Maintenance Engineering, 1998
- Optimizing a Production System with a Fixed Delivery ScheduleJournal of the Operational Research Society, 1996
- ANALYSIS OF A MARKOV CHAIN MODEL OF A MULTISTAGE MANUFACTURING SYSTEM WITH INSPECTION, REJECTION, AND REWORKIIE Transactions, 1993
- Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approachInternational Journal of Production Research, 1987
- Economic Production Cycles with Imperfect Production ProcessesIIE Transactions, 1986