The rolling horizon procedure on deterministic lockage co‐scheduling to the two dams of the Three Gorges Project
Authors:
- 10 August 2010
- journal article
- Published by Emerald Publishing in Kybernetes
- Vol. 39 (8) , 1376-1383
Abstract
Purpose – The purpose of this paper is to propose a rolling horizon procedure (RHP) to deal with the large-scale and strongly NP-hard problem on cooperative lockage-timetables and service-policies of the five locks in the Three Gorges Project. Design/methodology/approach – RHP based approach is composed of a series of periodical short-time sub-optimizations instead of global optimization. Each of the sub-optimizations is modeled by a mixed-integer-programming and solved by a branch and bound algorithm with terminal penalty. Findings – The RHP method is found to be effective and efficient. The size of the rolling horizon is positively correlated to the total weighted area of ships. Research limitations/implications – Precision of short-time predictions is the main limitation. Originality/value – This procedure promotes the navigation capacity of the Three Gorges Project and proposes a solution to the lockage-scheduling problem of the Three Gorges Project.Keywords
This publication has 7 references indexed in Scilit:
- Multi-Objective Algorithm for Navigation Co-Scheduling of the Three Gorges Dam and Gezhouba Dam2007
- Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problemComputers & Operations Research, 2005
- A Mesoscopic Electromechanical Theory of Ferroelectric Films and CeramicsAIP Conference Proceedings, 2002
- Information, prediction and structural whole: an introductionKybernetes, 2001
- Introduction: discontinuity – a weakness of calculus and beginning of a new eraKybernetes, 1998
- Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release datesAnnals of Operations Research, 1997
- A model of general systemsMathematical Modelling, 1987