Abstract
The second part of this two-paper series presents the extended formulation for the lifted multi-year multi-stage robust transmission expansion planning (LMMR-TEP) model introduced in the first part. The proposed planning approach is successfully tested on the Garver 6-bus and on a 118-bus+118-bus test system with different input settings.

This publication has 4 references indexed in Scilit: