A Multistage Robust Transmission Expansion Planning Model Based on Mixed-Binary Linear Decision Rules—Part II
- 30 January 2018
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 33 (5) , 5351-5364
Abstract
The second part of this two-paper series presents the extended formulation for the lifted multi-year multi-stage robust transmission expansion planning (LMMR-TEP) model introduced in the first part. The proposed planning approach is successfully tested on the Garver 6-bus and on a 118-bus+118-bus test system with different input settings.Keywords
This publication has 4 references indexed in Scilit:
- A Multistage Robust Transmission Expansion Planning Model Based on Mixed Binary Linear Decision Rules—Part IIEEE Transactions on Power Systems, 2018
- Adaptive Robust Transmission Expansion Planning Using Linear Decision RulesIEEE Transactions on Power Systems, 2017
- Reliability-Constrained Robust Power System Expansion PlanningIEEE Transactions on Power Systems, 2015
- Transmission Network Estimation Using Linear ProgrammingIEEE Transactions on Power Apparatus and Systems, 1970