A scheduling problem for a novel container transport system: a case of mobile harbor operation schedule
Authors:
- 26 January 2012
- journal article
- research article
- Published by Springer Nature in Flexible Services and Manufacturing Journal
- Vol. 25 (4) , 576-608
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Seaside Operations Planning in Container Terminals2009
- A tabu search heuristic for the quay crane scheduling problemJournal of Scheduling, 2007
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departuresNaval Research Logistics (NRL), 2005
- A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminalNaval Research Logistics (NRL), 2005
- A hybrid genetic algorithm for the job shop scheduling problemEuropean Journal of Operational Research, 2005
- Heuristic algorithms for single and multiple depot vehicle routing problems with pickups and deliveriesEuropean Journal of Operational Research, 2005
- A crane scheduling method for port container terminalsEuropean Journal of Operational Research, 2004
- A cluster insertion heuristic for single and multiple depot vehicle routing problems with backhaulingJournal of the Operational Research Society, 1999
- A genetic algorithm methodology for complex scheduling problemsNaval Research Logistics (NRL), 1999
- A branch and bound solution method for the crane scheduling problemTransportation Research Part B: Methodological, 1990