Operations Status and Bottleneck Analysis and Improvement of a Batch Process Manufacturing Line Using Discrete Event Simulation
Authors:
- Sriram VelumaniSVSriram Velumani
- He TangHTHe Tang
Open Access
- 1 January 2017
- journal article
- Published by Elsevier in Procedia Manufacturing
- Vol. 10, 100-111
Abstract
No abstract availableThis publication has 14 references indexed in Scilit:
- Feedback control for priority rules in re-entrant semiconductor manufacturingApplied Mathematical Modelling, 2015
- Analysis of multi-product manufacturing systems with arbitrary processing timesInternational Journal of Production Research, 2014
- OEE Evaluation of a Paced Assembly Line through Different Calculation and Simulation Methods: A Case Study in the Pharmaceutical EnvironmentInternational Journal of Engineering Business Management, 2014
- Overall Equipment Effectiveness (OEE) Calculation - Automation through Hardware & Software DevelopmentProcedia Engineering, 2013
- Re-entrant lines with unreliable asynchronous machines and finite buffers: performance approximation and bottleneck identificationInternational Journal of Production Research, 2011
- Production Systems Engineering2009
- Applying a simulation-based tool to productivity management in an automotive-parts industry2008
- How lean can lean buffers be?IIE Transactions, 2005
- Grand Challenges in Modeling and Simulation of Complex Manufacturing SystemsSIMULATION, 2004
- Introduction to modeling and simulation2004