Reengineering Production Systems: the Royal Netherlands Naval Dockyard
Authors:
- W.H.M. ZijmWZW.H.M. Zijm
- H.J.J. KalsHKH.J.J. Kals
- 1 January 1996
- journal article
- Published by Elsevier in CIRP Annals
- Vol. 45 (1) , 427-432
Abstract
No abstract availableKeywords
This publication has 2 references indexed in Scilit:
- The Integration of Process Planning and Shop Floor Scheduling in Small Batch Part ManufacturingCIRP Annals, 1995
- The Shifting Bottleneck Procedure for Job Shop SchedulingManagement Science, 1988