Reinforced waterproof rings around tunnels formed by injection rockbolts: stages of formation
Open Access
- 1 May 2026
- conference paper
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 1630 (1)
Abstract
The formation of reinforced waterproof rings around tunnels using injection rockbolts is a multi-stage process that strongly influences both the stress–strain state of the surrounding rock mass and its hydraulic properties. This study presents a numerical investigation of the coupled processes of rock deformation and viscous fluid filtration during grout injection, subsequent hardening, and the final reinforcement stage when injection pipes act as rockbolts. The results demonstrate that during the injection stage, high pore pressure leads to crack opening, increased permeability, and a rise in stress anisotropy, indicating elevated shear stresses, while the level of confining pressure decreases, highlighting the risk of extensional failure. As the grout hardens, a “monolithic ring” forms around the tunnel, which carries part of the rock pressure, the stress anisotropy Q * decreases by 1.5 times, and there is a sharp reduction in the permeability of the grouted rock mass. In the reinforcement stage, the fixed steel pipes act as rockbolts, creating a composite system rock–grout–rockbolt that stabilizes tunnel deformations. The findings underline the importance of considering the time-dependent stages of grout injection and hardening in tunnel design, offering insights for optimizing injection parameters and improving the safety and durability of underground structures.Keywords
This publication has 36 references indexed in Scilit:
- Study on the Hierarchical Grouting Reinforcement Control of Low Permeability Surrounding Rocks of Deep RoadwayEnergy Science & Engineering, 2025
- Finite Element Analysis of Expansive Bedrock Considering Electro-chemo-mechanical Coupling Phenomena in Crystal Layers of Clay Minerals and Internal Structural DegradationRock Mechanics and Rock Engineering, 2022
- Coupled Viscous Fluid Flow and Joint Deformation Analysis for Grout Injection in a Rock JointRock Mechanics and Rock Engineering, 2017
- Rock Mass Grouting in the Løren Tunnel: Case Study with the Main Focus on the Groutability and Feasibility of Drill Parameter InterpretationRock Mechanics and Rock Engineering, 2013
- Mohr‐Coulomb Yield Criterion in Rock Plastic MechanicsChinese Journal of Geophysics, 2012
- Evolution of the effective moduli of an anisotropic, dense, granular materialGranular Matter, 2012
- Mohr–Coulomb Failure CriterionRock Mechanics and Rock Engineering, 2012
- Computational Methods for Plasticity2008
- Motivation. One-Dimensional Plasticity and Viscoplasticity2006
- Rock deformation problemsInternational Applied Mechanics, 2004