Recycling Test Methods to Improve Test Capacity and Increase Chip Shipments
Authors:
- 10 November 2022
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Design & Test
- Vol. 40 (3) , 45-52
Abstract
In this research, we quantified semiconductor fabrication capability parameters and test capability parameters and used a digital integrated circuit test model (DITM) to discuss the impact of the test guardband (TGB) on test yield. Furthermore, the DITM can be used to estimate the yield distribution trend of future semiconductor products using data from the IEEE International Roadmap for Devices and Systems (IRDS) 2021 Table. With the COVID-19 pandemic, the global semiconductor industry is facing chip and material shortages. Furthermore, test technology lags behind semiconductor manufacturing technology, and the test yield of production capacity is deteriorating, seriously affecting the entire semiconductor supply chain. Therefore, we proposed the recycling test method, extending the test time, moving TGB, and repeatedly looking for reliable products. These parameters were calculated using the estimated product parameters released by the IRDS 2021. We proved that the proposed recycling test method could improve the high-yield target of semiconductor testing. As long as test methods are used properly, not only can high-yield shipments be made, but also companies’ overall profit will be significantly improved, and the problem of chip shortages will be solved.Keywords
This publication has 6 references indexed in Scilit:
- Wafer-Level Die Re-Test Success Prediction Using Machine Learning2020
- Test yield and quality analysis models of chipsJournal of the Chinese Institute of Engineers, 2020
- Repeated Testing Applications for Improving the IC Test Quality to Achieve Zero Defect Product RequirementsJournal of Electronic Testing, 2019
- Optimized Test Error Detection by Probabilistic Retest Recommendation Models2011
- Reducing the overkills and retests in wafer testing process2003
- Accuracy requirements in at-speed functional test2003