Makespan minimization of a flowshop sequence-dependent group scheduling problem
- 26 February 2011
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 56 (5-8) , 699-710
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- A survey of scheduling problems with setup times or costsEuropean Journal of Operational Research, 2008
- Scheduling and lot sizing with sequence-dependent setup: A literature reviewIIE Transactions, 2006
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setupsComputers & Operations Research, 2006
- Flowshop-scheduling problems with makespan criterion: a reviewInternational Journal of Production Research, 2005
- Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setupsComputers & Industrial Engineering, 2005
- Scheduling a flowline manufacturing cell with sequence dependent family setup timesEuropean Journal of Operational Research, 2000
- A REVIEW OF FLOWSHOP SCHEDULING RESEARCH WITH SETUP TIMESProduction and Operations Management, 2000
- A review of scheduling research involving setup considerationsOmega, 1999
- Batching and Scheduling1996
- Sequencing Research and the Industrial Scheduling Problem1973