Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
Authors:
Open Access
- 4 June 2007
- journal article
- research article
- Published by Wiley in Naval Research Logistics (NRL)
- Vol. 54 (6) , 602-614
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- Stochastic scheduling subject to machine breakdowns: The preemptive‐repeat model with discounted reward and other criteriaNaval Research Logistics (NRL), 2004
- Minimizing Job Tardiness Using Integrated Preventive Maintenance Planning and Production SchedulingIIE Transactions, 2003
- Scheduling maintenance and semiresumable jobs on a single machineNaval Research Logistics (NRL), 1999
- Single Machine Scheduling Problems with General Breakdowns, Earliness and Tardiness CostsOperations Research, 1997
- Single Machine Scheduling Problem When the Machine Capacity Varies StochasticallyOperations Research, 1992
- Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobsNaval Research Logistics (NRL), 1991
- Assessing the effects of machine breakdowns in stochastic schedulingOperations Research Letters, 1988
- Evaluating the effects of machine breakdowns in stochastic scheduling problemsNaval Research Logistics (NRL), 1987
- Scheduling stochastic jobs on a single machine subject to breakdownsNaval Research Logistics Quarterly, 1984
- A dual algorithm for the one-machine scheduling problemMathematical Programming, 1976