On the Fine-grained Parameterized Complexity of Partial Scheduling to Minimize the Makespan
Open Access
- 7 May 2022
- journal article
- research article
- Published by Springer Nature in Algorithmica
- Vol. 84 (8) , 2309-2334
Abstract
We study a natural variant of scheduling that we call partial scheduling: in this variant an instance of a scheduling problem along with an integer k is given and one seeks an optimal schedule where not all, but only k jobs, have to be processed. Specifically, we aim to determine the fine-grained parameterized complexity of partial scheduling problems parameterized by k for all variants of scheduling problems that minimize the makespan and involve unit/arbitrary processing times, identical/unrelated parallel machines, release/due dates, and precedence constraints. That is, we investigate whether algorithms with runtimes of the type $$f(k)n^{{\mathcal {O}}(1)}$$ or $$n^{{\mathcal {O}}(f(k))}$$ exist for a function f that is as small as possible. Our contribution is two-fold: First, we categorize each variant to be either in $${\mathsf {P}}$$ , $${{\mathsf {N}}}{{\mathsf {P}}}$$ -complete and fixed-parameter tractable by k, or $${\mathsf {W}}[1]$$ -hard parameterized by k. Second, for many interesting cases we further investigate the runtime on a finer scale and obtain run times that are (almost) optimal assuming the Exponential Time Hypothesis. As one of our main technical contributions, we give an $${\mathcal {O}}(8^kk(|V|+|E|))$$ time algorithm to solve instances of partial scheduling problems minimizing the makespan with unit length jobs, precedence constraints and release dates, where $$G=(V,E)$$ is the graph with precedence constraints.
Keywords
Funding Information
- European Research Council (617951, 853234)
- Nederlandse Organisatie voor Wetenschappelijk Onderzoek (024.002.003, 613.009.031b)
- European Research Council (617951)
This publication has 24 references indexed in Scilit:
- A note on combined job selection and sequencing problemsNaval Research Logistics (NRL), 2013
- A survey on offline scheduling with rejectionJournal of Scheduling, 2012
- Scheduling with OutliersLecture Notes in Computer Science, 2009
- A single resource scheduling problem with job-selection flexibility, tardiness costs and controllable processing timesComputers & Industrial Engineering, 2007
- Approximation Algorithms for the Job Interval Selection Problem and Related Scheduling ProblemsMathematics of Operations Research, 2006
- On the parametric complexity of schedules to minimize tardy tasksTheoretical Computer Science, 2003
- W[2]-hardness of precedence constrained K-processor schedulingOperations Research Letters, 1995
- Color-codingJournal of the ACM, 1995
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Complexity of Machine Scheduling Problems1977