Application of GA optimization for solving precedent relationship problem in project scheduling
Authors:
- Ivan W.H. FungIFIvan W.H. Fung
- C. HuangCHC. Huang
- C.M. TamCTC.M. Tam
- 31 May 2013
- journal article
- Published by Elsevier in Mathematical and Computer Modelling
- Vol. 57 (9-10) , 2067-2081
Abstract
No abstract availableFunding Information
- Hong Kong Special Administrative Region (9041231(CityU 113407))
- CityU (7008011)
This publication has 10 references indexed in Scilit:
- Metaheuristics for project and construction management – A state-of-the-art reviewAutomation in Construction, 2011
- A genetic algorithm-based method for scheduling repetitive construction projectsAutomation in Construction, 2009
- A two-phase GA model for resource-constrained project schedulingAutomation in Construction, 2009
- Improved genetic algorithm for resource-constrained scheduling of large projectsCanadian Journal of Civil Engineering, 2009
- Integration of cost and schedule using extensive matrix method and spreadsheetsAutomation in Construction, 2008
- Effects of resource allocation policies for reducing project durations: a systems modelling approachSystems Research and Behavioral Science, 2007
- Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction ProjectsJournal of Construction Engineering and Management, 2006
- Time-Cost Optimization of Construction Projects with Generalized Activity ConstraintsJournal of Construction Engineering and Management, 2005
- Project scheduling and monitoring: current research statusConstruction Innovation, 2004
- Optimization of Resource Allocation and Leveling Using Genetic AlgorithmsJournal of Construction Engineering and Management, 1999