Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia
- 22 July 2019
- journal article
- research article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 27 (1) , 186-204
Abstract
Purpose: The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia.Design/methodology/approach: Barriers recording highest citation amongst researchers worldwide were collated in the form of a conceptual model. This model was validated via a partial least squares structural equation modelling technique.Findings: Findings advance the body of knowledge on IPD by providing original insights into the nature of key barriers, quantifying the relative importance of each barrier.Research limitations/implications: Despite the above-mentioned contributions, and before drawing any conclusion, it is prudent to acknowledge limitations, particularly the chosen research approach in focusing on the Malaysian context. Therefore, caution must be exercised in direct application of findings to other contexts; research findings should be seen through the lens of moderatum generalisations (see Payne and Williams, 2005).Practical implications: Apart from contributions to the body of knowledge, for the world of practice, conditions impacting a transition to IPD are discussed, with a recommendation for change management through a tested mechanism like the European Corporate Sustainability Framework.Originality/value: Being the first empirical study undertaken to quantify the relationship among the identified barriers and IPD, the present study contributes to the field by addressing the gap in IPD research in Malaysia, as an exemplar of a developing country; it creates knowledge to inform further improvements in project performance through facilitating IPD use. The study also offers insight to construction stakeholders in other developing countries for tackling issues that hinder the adoption of an IPD approach, and it also points to major barriers such that resources for tackling barriers may be allocated properly.Keywords
This publication has 61 references indexed in Scilit:
- A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRANTechnological and Economic Development of Economy, 2012
- The relationship between integrated design and construction and safety on construction projectsConstruction Management and Economics, 2010
- Understanding Construction Industry Experience and Attitudes toward Integrated Project DeliveryJournal of Construction Engineering and Management, 2010
- The Integrated Agreement for Lean Project Delivery2010
- Challenges for Integrated Design and Delivery SolutionsArchitectural Engineering and Design Management, 2010
- Organisational change management: A critical reviewJournal of Change Management, 2005
- Creating value by delivering integrated solutionsInternational Journal of Project Management, 2005
- Kurt Lewin and the Planned Approach to Change: A Re‐appraisalJournal of Management Studies, 2004
- Effects of Survey Experience on Respondents' Attitudes Towards SurveysBulletin of Sociological Methodology/Bulletin de Méthodologie Sociologique, 2004
- Models of Construction InnovationJournal of Construction Engineering and Management, 1998