Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs
Author:
- 10 November 2018
- journal article
- research article
- Published by Springer Nature in Operational Research
- Vol. 21 (1) , 167-204
Abstract
No abstract availableKeywords
This publication has 66 references indexed in Scilit:
- Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair timeApplied Mathematical Modelling, 2011
- A production policy considering reworking of imperfect items and trade creditFlexible Services and Manufacturing Journal, 2010
- Economic production quantity with rework process at a single-stage manufacturing system with planned backordersComputers & Industrial Engineering, 2009
- An optimal operating policy for the production system with reworkComputers & Industrial Engineering, 2009
- Lot sizing with random yield and different qualitiesApplied Mathematical Modelling, 2009
- Economic lot sizing for an imperfect production system subject to random breakdownsEngineering Optimization, 2006
- Optimal manufacturing batch size with rework process at a single-stage production systemComputers & Industrial Engineering, 2004
- Bounds for production lot sizing with machine breakdownsComputers & Industrial Engineering, 1997
- A simple approximation of the EMQ model with Poisson machine failuresProduction Planning & Control, 1997
- Economic Production Cycles with Imperfect Production ProcessesIIE Transactions, 1986