Cycle time analysis in reentrant robotic cells with swap ability
- 1 February 2012
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (22) , 6372-6387
Abstract
In this paper, reentrant robotic cells composed of a robot with swap ability for a single part type is studied. In this regard, we restrict our attention to the two-machine reentrant cell scheduling problem. In the cell, a part visits the machines at least once. To minimise the cycle time, the sequence of robot moves must be optimised. Based on our previous study on the optimality of robotic cells, we restrict our investigation to only one-unit cycles. Therefore, all one-unit cycles are generated and their cycle time formulae are developed. Initially, we determine both essential and sufficient conditions for different cycles to be optimal and present the regions of optimality when each part reenters the first machine two times. We determine optimality conditions for different cycles when each part reenters both machines two times. Finally, sensitivity analysis is performed for both cases and the influence of the parameter values in the regions of optimality for each cycle is shown.Keywords
This publication has 27 references indexed in Scilit:
- Bicriteria robotic cell scheduling with controllable processing timesInternational Journal of Production Research, 2011
- Robotic cells with stochastic processing timesIIE Transactions, 2010
- A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windowsInternational Journal of Production Research, 2009
- Productivity analysis in a robotic cellInternational Journal of Production Research, 2009
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing timesInternational Journal of Production Research, 2008
- Scheduling Single-Armed Cluster Tools With Reentrant Wafer FlowsIEEE Transactions on Semiconductor Manufacturing, 2006
- A note on productivity gains in flexible robotic cellsInternational Journal of Flexible Manufacturing Systems, 2005
- Multicyclic hoist scheduling with constant processing timesIEEE Transactions on Robotics and Automation, 2002
- Sequencing of parts and robot moves in a robotic cellInternational Journal of Flexible Manufacturing Systems, 1992
- Automated Two-machine Flowshop Scheduling: A Solvable CaseIIE Transactions, 1991