Switching Sequence Optimization for Service Restoration in Distribution Networks
Authors:
- 26 October 2020
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 6-10
Abstract
This study considers the service restoration problem in medium voltage distribution networks that have a meshed topology but are operated radially. A mixed-integer linear program (MILP) is proposed to incorporate technical constraints as well as practical considerations from the Distribution System Operator (DSO). As a result, a sequence of switching steps that need to be done to restore the power supply to the customers is provided. The proposed methodology can assist the decision making of operators in the control center at the DSO. To demonstrate this, a real distribution network is used in a case study.Keywords
This publication has 11 references indexed in Scilit:
- Multi-Time Step Service Restoration for Advanced Distribution Systems and MicrogridsIEEE Transactions on Smart Grid, 2017
- Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution SystemsIEEE Transactions on Smart Grid, 2017
- Power Distribution System Outage Management With Co-Optimization of Repairs, Reconfiguration, and DG DispatchIEEE Transactions on Smart Grid, 2017
- Pyomo — Optimization Modeling in Python2017
- A New Mathematical Model for the Restoration Problem in Balanced Radial Distribution SystemsIEEE Transactions on Power Systems, 2015
- Mathematical representation of radiality constraint in distribution system reconfiguration problemInternational Journal of Electrical Power & Energy Systems, 2015
- Linear Current Flow Equations With Application to Distribution Systems ReconfigurationIEEE Transactions on Power Systems, 2014
- Practice-oriented optimization of distribution network planning using metaheuristic algorithms2014
- Smart integration of distribution automation applications2012
- Network reconfiguration in distribution systems for loss reduction and load balancingIEEE Transactions on Power Delivery, 1989