Zircaloy Performance in Light-Water Reactors
Authors:
- 1 January 1979
- book chapter
- Published by ASTM International
- p. 19-39
Abstract
The Zircaloys-2 and -4 are the principal metallic components of light-water reactor (LWR) fuel assemblies. This paper reviews progress in our understanding of Zircaloy behavior in the LWR environment. A significant body of data has been obtained on the characteristics of stress corrosion cracking pellet-cladding interaction (PCI) failures and on the mechanical stability of both fuel rod and assembly. All indications are that the mechanical performance of Zircaloy components is well understood and that cladding and assembly distortions can be controlled to avoid problems with operation, handling, or licensing. However, uncertainties still exist in our understanding of the resistance of Zircaloy to chemical attack from both the fission product environment and the coolant. Therefore, future emphasis will be on demonstrating improved resistance to PCI of various fuel rod design/material modifications and on establishing Zircaloy waterside corrosion limits for the new, higher-temperature, pressurized water reactor (PWR) cores that might be required to operate to higher exposures.Keywords
This publication has 9 references indexed in Scilit:
- Stress corrosion fracture of zircaloy cladding in fuel rods subjected to power increases: A model for crack propagation and the failure threshold stressJournal of Nuclear Materials, 1979
- EPRI--NASA cooperative project on stress corrosion cracking of Zircaloys. Final report1978
- Reactor Fuel Reliability Constraints on Power Shape ControlNuclear Science and Engineering, 1977
- Fuel Failures in the Dodewaard Boiling Water ReactorNuclear Technology, 1977
- Planning support document for the EPRI Light Water Reactor Fuel Performance program1977
- Use of nuclear plant operating experience to guide productivity improvement programs. Special report1975
- Halogen stress corrosion cracking of zircaloy-4 tubingJournal of Nuclear Materials, 1975
- Saxton Plutonium Project. Quarterly progress report for the period ending June 30, 19731973
- Yield loci of Zircaloy tubing with different texturesCanadian Metallurgical Quarterly, 1972