Further theoretical considerations on the relationship between MRP, input-output analysis and multi-echelon inventory systems
Authors:
- 30 June 1994
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 35 (1-3) , 299-311
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Intertemporal generalization of the relationship between material requirements planning and input-output analysisInternational Journal of Production Economics, 1992
- A survey and analysis of the application of the Laplace transform to present value problemsDecisions in Economics and Finance, 1989
- A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory SystemMathematics of Operations Research, 1986
- Evaluation of capital costs in a multi-level inventory system by means of the annuity stream principleEuropean Journal of Operational Research, 1986
- Note—Comments on the Optimality in “Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems”Management Science, 1981
- A principle for determining the correct capital costs of work-in-progress and inventoryInternational Journal of Production Research, 1980
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly SystemsManagement Science, 1975
- Economic Lot Size Determination in Multi-Stage Assembly SystemsManagement Science, 1973
- Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory SystemsOperations Research, 1969
- On The Application of the Laplace Transform to Certain Economic ProblemsManagement Science, 1967