Optimal production run length and inspection schedules in a deteriorating production process
Authors:
- 1 May 2001
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 33 (5) , 421-426
Abstract
This paper presents an economic manufacturing quantity model which determines an optimal production run length and inspection schedules simultaneously in a deteriorating production process. It is assumed that a production process is subject to a random deterioration from the in-control state to the out-of-control state and, thus, produces some proportion of defective items. An optimal production run length and an optimal number of inspections are derived, and unique properties of the proposed model are discussed. A numerical experiment is carried out to examine the behavior of the proposed model and compare the proposed model to an existing model.Keywords
This publication has 13 references indexed in Scilit:
- An optimal production run length in deteriorating production processesInternational Journal of Production Economics, 1999
- An extended EMQ model for a failure prone machine with general lifetime distributionInternational Journal of Production Economics, 1997
- Optimal production policy for a single-product single-machine problem with intermediate machine inspection allowedInternational Journal of Production Economics, 1992
- Production Batching with Machine Breakdowns and Safety StocksOperations Research, 1992
- Production Lot Sizing with Machine BreakdownsManagement Science, 1992
- Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production SystemJournal of the Operational Research Society, 1991
- A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection DelayIIE Transactions, 1989
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production SystemManagement Science, 1987
- Economic Production Cycles with Imperfect Production ProcessesIIE Transactions, 1986
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost ReductionOperations Research, 1986