Circular Economy Policy of Bike Industry- Exploring the Optimal ETO Component under Imperfect Production Processes System
- 29 August 2021
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Abstract
The concept of circular economy (CE) is to an increasing extent treated as a solution to series of challenges such as waste generation, resource scarcity and sustaining economic benefits. Specific circumstances and motivations have stimulated ideas relevant to circularity in the past through activities such as Reduce, Reuse, Recycle, or Regeneration (4R). This study investigates a CE policy in an imperfect production system with Engineered-To-Order (ETO) component and general component. Keeping all these facts in mind, we propose a CE policy with the optimal production. Finally, we have illustrated our model by numerical example from the bike industry. Sensitivity analysis is also performed to obtain some managerial insights.Keywords
Funding Information
- Ministry of Science and Technology of the Republic of China (MOST109-2622-H-324-001)
This publication has 13 references indexed in Scilit:
- Circular Economy: The Concept and its LimitationsEcological Economics, 2018
- Joint optimization of lot sizing and condition-based maintenance for multi-component production systemsComputers & Industrial Engineering, 2017
- Joint condition-based maintenance and inventory optimization for systems with multiple componentsEuropean Journal of Operational Research, 2017
- The Circular Economy: An Interdisciplinary Exploration of the Concept and Application in a Global ContextJournal of Business Ethics, 2015
- Optimal trade credit and lot size policies in economic production quantity models with learning curve production costsInternational Journal of Production Economics, 2014
- Optimal production lot with imperfect production process under permissible delay in payments and complete backloggingInternational Journal of Production Economics, 2013
- Analysis of a multi-component periodic review inventory system in an assembly environmentOR Spectrum, 2012
- TECHNICAL NOTE—Optimal Control of an Assembly System with Multiple Stages and Multiple Demand ClassesOperations Research, 2011
- Optimal production run time for two-stage production system with imperfect processes and allowable shortagesCentral European Journal of Operations Research, 2010
- Measuring Corporate SustainabilityJournal of Environmental Planning and Management, 2000