In Situ Stress Determination for Liquefied Petroleum Gas Storage Caverns by Hydraulic Tests on Pre-existing Fractures
Authors:
- 21 June 2014
- journal article
- Published by Springer Nature in Rock Mechanics and Rock Engineering
- Vol. 48 (3) , 1313-1319
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- In situ stress measurements by hydraulic fracturing in the Western Route of South to North Water Transfer Project in ChinaEngineering Geology, 2014
- Field evaluation of permeability of concrete linings and rock masses around underground lined rock caverns by a novel in-situ measurement systemEngineering Geology, 2012
- Design of Pyongtaek LPG storage terminal underneath Lake Namyang: A case studyTunnelling and Underground Space Technology, 2005
- ISRM Suggested Methods for rock stress estimation—Part 3: hydraulic fracturing (HF) and/or hydraulic testing of pre-existing fractures (HTPF)International Journal of Rock Mechanics and Mining Sciences, 2003
- Electrical imaging and hydraulic testing for a complete stress determinationInternational Journal of Rock Mechanics and Mining Sciences, 2003
- Complete stress determination with the HTPF tool in a mountainous regionInternational Journal of Rock Mechanics and Mining Sciences, 1997
- Characteristics of shut‐in curves in hydraulic fracturing stress measurements and determination of in situ minimum compressive stressJournal of Geophysical Research, 1991
- Statistical evaluation of hydraulic fracturing stress measurement parametersInternational Journal of Rock Mechanics and Mining Sciences, 1989
- In situ stress determination from hydraulic injection test dataJournal of Geophysical Research, 1984
- An improved method for determining the regional stress tensor using earthquake focal mechanism data: Application to the San Fernando Earthquake SequenceJournal of Geophysical Research, 1984