Prediction of Wind Farm Power Ramp Rates: A Data-Mining Approach
Authors:
- 9 July 2009
- journal article
- research article
- Published by ASME International in Journal of Solar Energy Engineering
- Vol. 131 (3) , 031011
Abstract
In this paper, multivariate time series models were built to predict the power ramp rates of a wind farm. The power changes were predicted at 10 min intervals. Multivariate time series models were built with data-mining algorithms. Five different data-mining algorithms were tested using data collected at a wind farm. The support vector machine regression algorithm performed best out of the five algorithms studied in this research. It provided predictions of the power ramp rate for a time horizon of 10–60 min. The boosting tree algorithm selects parameters for enhancement of the prediction accuracy of the power ramp rate. The data used in this research originated at a wind farm of 100 turbines. The test results of multivariate time series models were presented in this paper. Suggestions for future research were provided.Keywords
This publication has 20 references indexed in Scilit:
- Wind farm power prediction: a data‐mining approachWind Energy, 2008
- Multilayer perceptron tumour diagnosis based on chromatography analysis of urinary nucleosidesNeural Networks, 2007
- Combustion Efficiency Optimization and Virtual Testing: A Data-Mining ApproachIEEE Transactions on Industrial Informatics, 2006
- Factory Cycle-Time Prediction With a Data-Mining ApproachIEEE Transactions on Semiconductor Manufacturing, 2006
- Very Short-Term Wind Forecasting for Tasmanian Power GenerationIEEE Transactions on Power Systems, 2006
- Newer Classification and Regression Tree Techniques: Bagging and Random Forests for Ecological PredictionEcosystems, 2006
- Long-Term Wind Speed and Power Forecasting Using Local Recurrent Neural Network ModelsIEEE Transactions on Energy Conversion, 2006
- Greedy function approximation: A gradient boosting machine.The Annals of Statistics, 2001
- Wrappers for feature subset selectionArtificial Intelligence, 1997
- Short-term resource scheduling with ramp constraints [power generation scheduling]IEEE Transactions on Power Systems, 1997