Two-stage, Multiple-lot, Lot Streaming Problem for a 1 + 2 Hybrid Flow Shop
- 1 January 2013
- journal article
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 46 (9) , 448-453
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Two-stage hybrid flow shop with precedence constraints and parallel machines at second stageComputers & Operations Research, 2012
- The hybrid flow shop scheduling problemEuropean Journal of Operational Research, 2010
- Single-job lot streaming in m−1 two-stage hybrid flowshopsEuropean Journal of Operational Research, 2008
- New tighter polynomial length formulations for the asymmetric traveling salesman problem with and without precedence constraintsOperations Research Letters, 2005
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hardEuropean Journal of Operational Research, 1996
- Scheduling a two-stage hybrid flowshop with separable setup and removal timesEuropean Journal of Operational Research, 1994
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Aggregate scheduling of a flexible machining and assembly systemIEEE Transactions on Robotics and Automation, 1989
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988