Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times
- 1 December 2015
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 170, 478-488
Abstract
No abstract availableKeywords
This publication has 20 references indexed in Scilit:
- Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due datesEuropean Journal of Operational Research, 2011
- An analytical model for service level and tardiness in a single machine MTO production systemInternational Journal of Production Research, 2010
- Planning order releases for an assembly system with random operation timesOR Spectrum, 2005
- The capacitated lot sizing problem: a review of models and algorithmsOmega, 2003
- MRP performance effects due to lot size and planned lead time settingsInternational Journal of Production Research, 2001
- Lot size dependent lead times in a Q,R inventory systemInternational Journal of Production Research, 1995
- Safety Stock versus Safety Time in MRP Controlled Production SystemsManagement Science, 1994
- Batching decisions: structure and modelsEuropean Journal of Operational Research, 1994
- Multi-item batching heuristics for minimization of queueing delaysEuropean Journal of Operational Research, 1992
- Lot Sizes, Lead Times and In-Process InventoriesManagement Science, 1987