Understanding the role of “tasks anticipated” in lookahead planning through simulation
Authors:
- 1 January 2015
- journal article
- Published by Elsevier in Automation in Construction
- Vol. 49, 18-26
Abstract
No abstract availableFunding Information
- University Research Board (URB)
This publication has 15 references indexed in Scilit:
- An optimal algorithm of the multi-lifting operating simulation for super-tall building constructionAutomation in Construction, 2013
- Development of a 4D object-based system for visualizing the risk information of construction projectsAutomation in Construction, 2013
- Work Flow Variation and Labor Productivity: Case StudyJournal of Management in Engineering, 2011
- Role of Simulation in Construction Engineering and ManagementJournal of Construction Engineering and Management, 2010
- Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysisFinite Elements in Analysis and Design, 2008
- Planning gang formwork operations for building construction using simulationsAutomation in Construction, 2004
- General-Purpose Systems for Effective Construction SimulationJournal of Construction Engineering and Management, 1999
- Shielding Production: Essential Step in Production ControlJournal of Construction Engineering and Management, 1998
- Prebid and Preconstruction Planning ProcessJournal of Construction Engineering and Management, 1993
- Simulation Technologies for Planning Heavy Construction ProcessesJournal of Construction Engineering and Management, 1993