Estimating Construction Duration for Public Roads During the Preplanning Phase
Open Access
- 31 January 2014
- journal article
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 4 (1) , 26-35
Abstract
Estimates of the construction time are of key importance in the early phases of the projectthey serve as a basis for the decision whether to commence with planning or not, and are used as input for budgets and programmes. Usually, such estimates base on experience with similar projects completed in the past. This experience may be recorded in the form of mathematical models that relate project characteristics to construction time. The aim of the research was, basing on real-life cases, to develop a model of public road building projects duration. The research comprised collection of input for the analyses, preselection of project features correlated with duration, and construction of three models: a simple statistical regression, a multifactor regression and a regression tree. The models were then compared to each other and to the models presented in the literature with respect to their predictive ability. With the assumed set of potential predictors of construction duration, the regression models were found statistically correct, though not precise enough be used as decision-support tools.Keywords
This publication has 11 references indexed in Scilit:
- Evaluating Production Time Buffer for Precast FabricationJournal of Engineering, Project, and Production Management, 2012
- Optimizing linear project scheduling with multi-skilled crewsAutomation in Construction, 2012
- AHP- and simulation-based budget determination procedure for public building construction projectsAutomation in Construction, 2008
- UTILIZING DATA MINING TO DISCOVER KNOWLEDGE IN CONSTRUCTION ENTERPRISE PERFORMANCE RECORDS/UTILIZUOTAS DUOMENŲ KAUPIMASJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2008
- Comparative analysis of cost estimates of major public investment projectsInternational Journal of Project Management, 2006
- Time‐cost model for building projects in NigeriaConstruction Management and Economics, 2006
- Time–Cost Relationships in Australian Building Construction ProjectsJournal of Construction Engineering and Management, 2005
- The predictive ability of Bromilow's timecost modelConstruction Management and Economics, 2001
- An investigation into construction time performanceConstruction Management and Economics, 1995
- Relationship between value and duration of construction projectsConstruction Management and Economics, 1991