A Note on Unrestricted AOQLs
Author:
- 1 April 1975
- journal article
- research article
- Published by Taylor & Francis in Journal of Quality Technology
- Vol. 7 (2) , 77-80
Abstract
In the past there have been a number of papers in which it has been shown that the AOQL of any Dodge type plan depends heavily on whether or not the assumption of statistical control is imposed on the production process. Through consideration of the continuous sampling plan CSP-1 it will be shown (by comparison with known results) that these AOQLs also depend on the type of sampling done while on partial inspection and on the interaction of the production process with the inspection procedure.Keywords
This publication has 9 references indexed in Scilit:
- The Computation of the Unrestricted AOQL when Defective Material is Removed but Not ReplacedJournal of the American Statistical Association, 1969
- The Evaluation of H 106 Continuous Sampling Plans under the Assumption of Worst ConditionsJournal of the American Statistical Association, 1966
- Markovian Decision Models for the Evaluation of a Large Class of Continuous Sampling Inspection PlansThe Annals of Mathematical Statistics, 1965
- Continuous Sampling Procedures Without ControlThe Annals of Mathematical Statistics, 1959
- Tightened Multi-Level Continuous Sampling PlansThe Annals of Mathematical Statistics, 1957
- Multi-Level Continuous Sampling PlansThe Annals of Mathematical Statistics, 1955
- A Note on Dodge's Continuous Inspection PlanThe Annals of Mathematical Statistics, 1953
- Sampling Inspection Plans for Continuous Production which Insure a Prescribed Limit on the Outgoing QualityThe Annals of Mathematical Statistics, 1945
- A Sampling Inspection Plan for Continuous ProductionThe Annals of Mathematical Statistics, 1943