Genetic Optimization for Dynamic Project Control
Authors:
- 1 August 2003
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 129 (4) , 396-404
Abstract
This paper presents a comprehensive model for cost optimization and dynamic project control. The model incorporates an integrated formulation for estimating, scheduling, resource management, and cash-flow analysis. The basic premise of the model is to allocate optional construction methods for each activity, varying from cheap and lengthy to expensive and short. Using a genetic algorithms procedure for total cost optimization, the model considers the actual progress of activities and optimizes the schedule of remaining ones (by determining the best combination of construction methods) so that project constraints are respected. The model, as such, is usable not only at the planning stage but also during construction. A description of the model and its application on an example project are provided in this paper. In addition, the paper introduces the recently emerged critical chain method for project control and describes an effort to incorporate some of its features into the earned-value analysis used in t...Keywords
This publication has 10 references indexed in Scilit:
- CONSCOM: An OO Construction Scheduling and Change Management SystemJournal of Construction Engineering and Management, 1999
- Critical Chain Project Management Improves Project PerformanceProject Management Journal, 1999
- Using Improved Genetic Algorithms to Facilitate Time-Cost OptimizationJournal of Construction Engineering and Management, 1997
- Continuous Assessment of Project PerformanceJournal of Construction Engineering and Management, 1997
- Construction Resource Scheduling with Genetic AlgorithmsJournal of Construction Engineering and Management, 1996
- New Approach for Optimization of Overall Construction ScheduleJournal of Construction Engineering and Management, 1996
- Analogy‐Based Solution to Markup Estimation ProblemJournal of Computing in Civil Engineering, 1994
- Economic optimization of construction project schedulingConstruction Management and Economics, 1990
- Bar Coding in Construction EngineeringJournal of Construction Engineering and Management, 1990
- Earned Value Technique for Performance MeasurementJournal of Management in Engineering, 1985