Impact of Design Cost on Design Bid Build Project Performance
- 17 May 2012
- conference paper
- Published by American Society of Civil Engineers (ASCE)
- p. 1570-1579
Abstract
Some study show that the performance of DBB projects depend upon the quality of the design. If errors are minimized during the design phase, then, construction costs are reduced and schedule growth are minimized. Therefore it is necessary that owners focus more on the project's design phase in order to improve the construction project performance. Based on prior research, this study hypothesizes that there are relationships between design costs and construction project performance of DBB public projects. Data was collected and analyzed regarding design cost, construction award cost, final construction cost, and construction duration of a set of DBB public projects. The analysis showed that the design cost was significantly correlated with construction cost growth and schedule growth of the public projects under evaluation. In addition, the design cost was found to have a significant correlation with the final construction cost. Using, a regression model developed to predict the final construction cost of a road project, and also using the design cost as an input variable, the R-square value of this model was found to be 58.7%. This result indicates that when design costs are higher, project construction performance is better.Keywords
This publication has 15 references indexed in Scilit:
- Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery MethodsJournal of Construction Engineering and Management, 2009
- Relating Cost Growth from the Initial Estimate to Design Fee for Transportation ProjectsJournal of Construction Engineering and Management, 2007
- Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of BiddersJournal of Construction Engineering and Management, 2005
- Statistical analysis of causes for change orders in metropolitan public worksInternational Journal of Project Management, 2004
- Key Factors in Bid Reasoning ModelJournal of Construction Engineering and Management, 2000
- A preliminary study of the factors affecting the cost escalation of construction projectsCanadian Journal of Civil Engineering, 2000
- Comparison of U.S. Project Delivery SystemsJournal of Construction Engineering and Management, 1998
- Design Fee versus Design DeficiencyJournal of Architectural Engineering, 1998
- Causes of Quality Deviations in Design and ConstructionJournal of Construction Engineering and Management, 1992
- Predictors of Cost‐Overrun RatesJournal of Construction Engineering and Management, 1990