Due Date Assignment in a Multistage Job Shop
Authors:
- 1 June 1989
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 21 (2) , 153-161
Abstract
In a Materials Requirements Planning (MRP) system, component lead times are generally assumed to be known and constant. Since a requirement of a MRP system is that components finish on time, slack is often built into component lead times to insure that actual job flowtimes equal planned job lead times. In this study, job characteristics and shop characteristics are investigated to determine which has a greater impact on predicting job flowtimes. This is accomplished by determining which characteristic most greatly influences the deviation of planned job lead times from actual job flowtimes. After identifying those factors which have the greatest influence on the job's flowtime, due date assignment rules are developed. A simulation study is then made to determine. which of the due date assignment rules perform best for varying product structures, as defined by various Bills of Materials (BOMs), and various shop conditions. Simulation test results are presented and discussed.Keywords
This publication has 15 references indexed in Scilit:
- Evaluating scheduling policies in a multi-level assembly systemInternational Journal of Production Research, 1986
- Setting Job-Shop Due-Dates with Service-Level ConstraintsJournal of the Operational Research Society, 1985
- AN EVALUATION OF SEQUENCING RULES FOR AN ASSEMBLY SHOPDecision Sciences, 1985
- Priority rules for shop floor control in a material requirements planning system under various levels of capacityInternational Journal of Production Research, 1985
- A comparative study of priority dispatching rules in a hybrid assembly/job shopInternational Journal of Production Research, 1984
- The effects of input control in a simple scheduling modelJournal of Operations Management, 1984
- OPERATING POLICIES FOR SCHEDULING ASSEMBLED PRODUCTSDecision Sciences, 1982
- Due Date Assignment for Production SystemsManagement Science, 1981
- An investigation of due‐date assignment rules with constrained tightnessJournal of Operations Management, 1981
- Due dates in job shop schedulingInternational Journal of Production Research, 1976