Abstract
Energy demand has been increasing, but traditional sources of energy are depletable. New investments are needed in renewable energy production. Hydroelectric power plants are often considered a feasible renewable source of energy and are often organized as a public private partnerships (PPP). However, risk factors stemming from the macro environment as well as project conditions should be considered in performing feasibility studies. The objective of this study was to develop a method that can be used to predict the profitability of hydropower investments considering the relevant risk factors. To that end, a cash flow that represents the construction and operation period is set up, the risk factors involved in such projects are identified, the impacts of these risk factors on the cash flow parameters are assessed, and Monte Carlo simulation is performed to estimate the net present value (NPV) of a hydropower investment. The proposed method was tested in a hydropower investment located in Turkey and generated credible results that could be of great benefit to potential investors operating in similar conditions. The primary contribution of this research is the creation of a method that allows investors to assess the profitability of a hydropower investment by using a stochastic approach.Keywords
This publication has 34 references indexed in Scilit:
- Modelling optimal risk allocation in PPP projects using artificial neural networksInternational Journal of Project Management, 2011
- Risk criticality and allocation in privatised water supply projects in IndonesiaInternational Journal of Project Management, 2010
- The analysis and allocation of risks in public private partnerships in infrastructure projects in NigeriaJournal of Financial Management of Property and Construction, 2006
- Good project governance for proper risk allocation in public–private partnerships in IndonesiaInternational Journal of Project Management, 2006
- Traffic revenue risk management through Annuity Model of PPP road projects in IndiaInternational Journal of Project Management, 2006
- Role of public private partnerships to manage risks in public sector projects in Hong KongInternational Journal of Project Management, 2006
- Determining a reasonable concession period for private sector provision of public works and serviceCanadian Journal of Civil Engineering, 2006
- A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projectsConstruction Management and Economics, 2000
- Evaluation and management of foreign exchange and revenue risks in China's BOT projectsConstruction Management and Economics, 2000
- Combining risks in estimatingConstruction Management and Economics, 1986