Abstract
The evaluation of the pavement preservation interventions is the most important component of a pavement management system. There is a need for a rational methodology to evaluate pavement preservation alternatives to maximize both project- and network-level benefits. Lack of adequate guidance on the timing of preventive maintenance treatments was the main motivation for this study. On the basis of different effectiveness criteria, mathematical models to estimate optimum timing (OT) of maintenance treatments are developed to alleviate surface rutting. The developed model based on the long-term benefits was found to be a rational and a practical tool to estimate OT for various maintenance treatments by adjusting its parameters. The sensitivity and practical usage of the models are demonstrated by using the SPS-3 pavement sections in the paper. Although the modeling approach uses the existing understanding, the model can estimate OT of a fix on the basis of the pretreatment pavement rutting performanc...