Structural equation modelling of construction project performance based on coordination factors
Open Access
- 1 January 2020
- journal article
- research article
- Published by Taylor & Francis in Cogent Engineering
- Vol. 7 (1)
Abstract
The construction industry has been dealing with numerous issues in order to achieve the projects’ objectives. Hence, caused most projects to suffer low performance, particularly in terms of cost and time overrun and poor quality level. Regarding this matter, the last decade has shown a frequent failure of projects which clearly describes the need for a systematic investigation of the coordination process effects on the performance of the project. The study investigates the impression of coordination factors on projects performance by adopting structural equation modeling (SEM) technique via fit indices and standardised paths. In current research case data were obtained from a questionnaire distributed among owners/developers, contractors, and consultants. A theoretical structural equation model was developed to signify the effect of five main latent variables on project performance. The outcomes showed that projects with high performance have better coordination efficiency. Whereas, planning and scheduling factors (PSF) group is the highest significant group that had a great influence on performance, while records and documentation factors (RDF) group obtained the second important score. Overall, the outcome of this study is expected to contribute to the construction management efforts, particularly in addressing the root causes of poor performance and improving projects success.Keywords
Funding Information
- research (YUTP 0153HA)
This publication has 18 references indexed in Scilit:
- Significant Factors Causing Cost Overruns in Large Construction Projects in MalaysiaJournal of Applied Sciences, 2013
- Factors of Conflict in Construction Industry: A Literature ReviewProcedia Engineering, 2011
- Communications and coordination in construction projectsConstruction Management and Economics, 2009
- The significant factors causing delay of building construction projects in MalaysiaEngineering, Construction and Architectural Management, 2007
- Critical determinants of project coordinationInternational Journal of Project Management, 2006
- The Effect of Varying Degrees of Nonnormality in Structural Equation ModelingStructural Equation Modeling: A Multidisciplinary Journal, 2005
- The knowledge of coordination for supply chain integrationBusiness Process Management Journal, 2002
- Construction Coordination Activities: What Is Important and What Consumes TimeJournal of Management in Engineering, 2001
- REPORT on the Sixth International Workshop on Chromosome 9 held at Denver, Colorado, U.S.A., 27 October 1998Annals of Human Genetics, 1999
- An evaluation of construction time performance in the building industryBuilding and Environment, 1996