Resource Leveling of Linear Schedules Using Integer Linear Programming
- 1 May 1998
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 124 (3) , 232-244
Abstract
Since the early 1960s many techniques have been developed to plan and schedule linear construction projects. However, one, the critical path method (CPM), overshadowed the others. As a result, CPM developed into the powerful and effective tool that it is today. However, research has indicated that CPM is ineffective for linear construction. Linear construction projects are typified by activities that must be repeated in different locations such as highways, pipelines, and tunnels. Recently, there has been renewed interest in linear scheduling. Much of this interest has involved a technique called the linear scheduling method (LSM). Only recently has there been the ability to calculate the controlling activities of a linear schedule, independent of network analysis. Additional research needs to be done to develop some of the techniques available in CPM into comparable ones for linear scheduling. One of these techniques is resource leveling. This paper uses the vehicle of a highway construction project to p...Keywords
This publication has 14 references indexed in Scilit:
- Zero‐one quadratic programming algorithm for resource leveling of manufacturing process schedulesSystems and Computers in Japan, 1995
- Optimal resource leveling using non-serial dyanamic programmingEuropean Journal of Operational Research, 1994
- CPM/LOB: New Methodology to Integrate CPM and Line of BalanceJournal of Construction Engineering and Management, 1994
- Discussion of “ Formal Development of Line‐of‐Balance Technique ” by Zohair M. Al Sarraj (December, 1990, Vol. 116, No. 4)Journal of Construction Engineering and Management, 1992
- Construction Scheduling: Principles, Practices, and Six Case StudiesJournal of Construction Engineering and Management, 1991
- CPM Use in ENR Top 400 ContractorsJournal of Management in Engineering, 1990
- Packing Method for Resource Leveling (Pack)Journal of Construction Engineering and Management, 1990
- RPM: Repetitive Project ModelingJournal of Construction Engineering and Management, 1990
- Resource Leveling in Construction by OptimizationJournal of Construction Engineering and Management, 1989
- Application of Linear SchedulingJournal of Construction Engineering and Management, 1986