An informative column generation and decomposition method for a production planning and facility location problem
Authors:
- Zhe LiangZLZhe Liang
- Yan HeYHYan He
- Tao WuTWTao Wu
- Canrong ZhangCZCanrong Zhang
- 1 December 2015
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 170, 88-96
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (71422003)
- National Natural Science Foundation of China (51105394)
- National Natural Science Foundation of China (71472108)
This publication has 32 references indexed in Scilit:
- Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost salesInternational Journal of Production Research, 2011
- A heuristic approach for big bucket multi-level production planning problemsEuropean Journal of Operational Research, 2009
- Dynamic capacitated lot-sizing problems: a classification and review of solution approachesOR Spectrum, 2008
- A New Dantzig-Wolfe Reformulation and Branch-and-Price Algorithm for the Capacitated Lot-Sizing Problem with Setup TimesOperations Research, 2007
- MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costsRAIRO - Operations Research, 2007
- Meta-heuristics for dynamic lot sizing: A review and comparison of solution approachesEuropean Journal of Operational Research, 2007
- Improved lower bounds for the capacitated lot sizing problem with setup timesOperations Research Letters, 2004
- bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing ProblemsManagement Science, 2000
- Lot sizing and scheduling — Survey and extensionsEuropean Journal of Operational Research, 1997
- The dynamic lot-sizing model with backlogging: A simpleo(n logn) algorithm and minimal forecast horizon procedureNaval Research Logistics (NRL), 1993