Preventive Maintenance for Key Components of Metro Door System Based on Improved Dung Beetle Optimizer Algorithm
Authors:
- 17 January 2024
- journal article
- research article
- Published by Springer Nature in Journal of Failure Analysis and Prevention
- Vol. 24 (1) , 424-435
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- Cause analysis and countermeasure on premature failure of a driven gear for the high-speed trainEngineering Failure Analysis, 2022
- Safety evaluation of urban rail transit operation considering uncertainty and risk preference: A case study in ChinaTransport Policy, 2022
- Optimization of preventive maintenance schedule of subway train components based on a game model from the perspective of failure riskSustainable Cities and Society, 2022
- Assessing the transition to low-carbon urban transport: A global comparisonResources, Conservation and Recycling, 2022
- Monitoring and Evaluation of the Lateral Stability of CWR TrackJournal of Failure Analysis and Prevention, 2021
- A Novel Reliability-Centered Opportunistic Maintenance Strategy for Metro Train Complex SystemsIEEE Intelligent Transportation Systems Magazine, 2020
- Application of Reliability-Centered Maintenance in Metro Door SystemIEEE Access, 2019
- A two-phase preventive maintenance policy considering imperfect repair and postponed replacementEuropean Journal of Operational Research, 2019
- Risk Evaluation of Railway Rolling Stock Failures Using FMECA Technique: A Case Study of Passenger Door SystemUrban Rail Transit, 2016
- Analysis of factors influencing safety management for metro construction in ChinaAccident Analysis & Prevention, 2014