Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times
Author:
- 1 March 2004
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 153 (3) , 581-592
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- A mathematical programming model for scheduling steelmaking-continuous casting productionEuropean Journal of Operational Research, 2000
- Batch scheduling in a two-machine flow shop with limited bufferDiscrete Applied Mathematics, 1997
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in ProcessOperations Research, 1996
- Scheduling high-grade steelmakingIEEE Expert, 1996
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times SeparatedJournal of the Operational Research Society, 1994
- Two-machine group scheduling problem with blocking and anticipatory setupsEuropean Journal of Operational Research, 1993
- Scheduling groups of jobs in the two-machine flow shopMathematical and Computer Modelling, 1990
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman ProblemOperations Research, 1964
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954