Development of finite capacity material requirement planning system for assembly operations
Authors:
- 1 July 2004
- journal article
- research article
- Published by Taylor & Francis in Production Planning & Control
- Vol. 15 (5) , 534-549
Abstract
A conventional material requirement planning (MRP) logic considers infinite capacity of machines. A planner must manually solve capacity problems (if any) after the material requirement plan has been generated. This paper tries to alleviate the capacity problems by developing a finite capacity material requirement planning (FCMRP) system for assembly operations. The FCMRP system is capable of automatically allocating some jobs from one machine to another and adjusting timing of the jobs considering a finite available time of all machines. The FCMRP system has been tested using real data from a steering-wheel factory. Effects of options – namely, scheduling, rearranging and adjusting options in the FCMRP system on the performance measures – are statistically analysed. The FCMRP system can reduce required overtime if the jobs are allowed to be completed earlier than the due dates. The required overtime can be further reduced if the jobs are allowed to be completed later than the due dates.Keywords
This publication has 10 references indexed in Scilit:
- A finite capacity material requirements planning systemProduction Planning & Control, 2000
- Integrating MRP and finite capacity planningProduction Planning & Control, 1997
- Application of optimized production technology in a capacity constrained flow shop: A case study in a battery factoryComputers & Industrial Engineering, 1994
- The challenges of capacity planningInternational Journal of Production Economics, 1993
- A New Framework for Manufacturing Planning and Control Systems*Decision Sciences, 1993
- AN ANALYSIS AND DISCUSSION OF THE OPTIMIZED PRODUCTION TECHNOLOGY SOFTWARE AND ITS USEProduction and Operations Management, 1992
- Efficient Solutions to a Linear Programming Model for Production Scheduling With Capacity Constraints and No Initial StockIIE Transactions, 1989
- Heuristics for Multilevel Lot-Sizing with a BottleneckManagement Science, 1986
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem ReductionManagement Science, 1983
- Schedule Based M.R.P.: An Integrated Approach to Production Scheduling and Material Requirements PlanningJournal of the Operational Research Society, 1982