Power System Restoration - The Second Task Force Report
Authors:
- M. M. AdibiMAM. M. Adibi
- J. N. BorkoskiJBJ. N. Borkoski
- R. J. KafkaRKR. J. Kafka
- 1 January 1987
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 2 (4) , 927-932
Abstract
In its second report, the Power System Restoration Task Force (PSR-TF) (1) reviews the 1979-83 North American Electric Reliability Council (NERC) Reports on Major Bulk Power System Disturbances (2), identifying restoration problems which have been encountered during that 5-year period. Generally, these problems fall into three phases of restoration activities: planning for restart, reintegration and restoration of the bulk power supply; control actions during system degradation for saving and retaining critical sources of power; and restoration after a major disturbance when the power system has stabilized. The report also briefly discusses the applicability of several existing programs to the system restoration process. The opinions and conclusions expressed in this paper are those of the authors; they are based on the referenced reports and have not been reviewed with NERC or the reporting utilities.Keywords
This publication has 3 references indexed in Scilit:
- Blackstart Utilization of Remote Combustion Turbines, Analytical Analysis and Field TestIEEE Power Engineering Review, 1984
- Role of Interactive and Control Computers in the Development of a System Restoration PlanIEEE Transactions on Power Apparatus and Systems, 1982
- System Restoration Plan Development for a Metropolitan Electric SystemIEEE Transactions on Power Apparatus and Systems, 1981