Abstract
In a competitive business environment, project management aligned with the business strategy caters to the organisation goals. Researchers and practitioners are constantly probing into the possible enhancement of the existing approaches to manage projects. Though the relevant literature recommends numerous methodologies to enhance the achievement of project performance, yet the importance of power evacuation projects is still unnoticed and little has been done in this area. This research aims to develop a strategic layout using critical influence factors (CIFs) of power evacuation projects. A survey is carried out in 47 companies which are working on power evacuation projects. The results of the statistical analysis revealed that there is a significant direct and indirect impact of the strategy, risk, contract, information technology (IT) and stakeholders on the project performance with respect to power evacuation projects.Keywords
This publication has 56 references indexed in Scilit:
- PROJECT DELAY: KEY ELECTRICAL CONSTRUCTION FACTORS IN HONG KONGJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017
- Pathways to Better Project Delivery: The Link Between Capacity Factors and Urban Infrastructure Projects in IndiaWorld Development, 2017
- Sustainability factors affecting local infrastructure projectFacilities, 2015
- Government-led critical success factors in PPP infrastructure developmentBuilt Environment Project and Asset Management, 2015
- An Analysis of Causes of Disputes in the Construction Industry Using Analytical Network ProcessProcedia - Social and Behavioral Sciences, 2014
- The role of dialogue in fostering acceptance of transmission lines: the case of a France–Spain interconnection projectEnergy Policy, 2013
- Ranking of delay factors in construction projects after Egyptian revolutionAlexandria Engineering Journal, 2013
- Safety risk management for electrical transmission and distribution line constructionSafety Science, 2013
- Transmission System Expansion Planning For Indian States: A Proactive and Realistic ApproachIOSR Journal of Electrical and Electronics Engineering, 2013
- The “real” success factors on projectsInternational Journal of Project Management, 2002