PREDICTING THE SCHEDULE AND COST PERFORMANCE IN PUBLIC SCHOOL BUILDING PROJECTS IN TAIWAN
Authors:
Open Access
- 20 December 2021
- journal article
- research article
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 28 (1) , 51-67
Abstract
The Ministry of Education (MOE) of Taiwan invests about NTD 30 billion a year in Public School Building Projects (PSBPs). However, 95% of the PSBPs have been extended and have incurred increased costs. A PSBP performance evaluation and prediction system was established by using the Fuzzy Delphi Method (FDM), association rules and an Artificial Neural Network (ANN). Sixty-two Taiwanese PSBPs were used as the samples, while eleven high correlation factors that influence the project performance of PSBPs were defined, and the reasons leading to the poor project performance were discussed in this study. Moreover, the results of the test cases operated by ANN showed that the accuracy rate for schedule and cost variability predictions can reach 84%. The high accuracy rate indicated the reliability of priority control for high-risk projects in the future. The proposed approach can be provided to clients, design and construction firms, and project managers to understand the project performance in real time and to establish a dynamic tracking review and response measures for improving the overall project satisfaction.Keywords
This publication has 61 references indexed in Scilit:
- Using ontologies to facilitate post-processing of association rules by domain expertsInformation Sciences, 2011
- Estimation of earthworks execution time cost by means of artificial neural networksAutomation in Construction, 2010
- Constructing performance appraisal indicators for mobility of the service industries using Fuzzy Delphi MethodExpert Systems with Applications, 2008
- REASONED DECISIONS IN CONSTRUCTION CONTRACTS EVALUATION / RACIONALUŪS SPRENDIMAI VERTINANT STATYBOS RANGOS SUTARTISTechnological and Economic Development of Economy, 2008
- Analytic network process-based model for selecting an optimal product design solution with zero–one goal programmingJournal of Engineering Design, 2008
- Project Management Priorities and the Link with Performance Management SystemsProject Management Journal, 2007
- Competitiveness in construction: a critical review of researchConstruction Management and Economics, 2007
- Analyzing the subjective interestingness of association rulesIEEE Intelligent Systems and their Applications, 2000
- Construction cost prediction for public school buildings in JordanConstruction Management and Economics, 1996
- Mining association rules between sets of items in large databasesACM SIGMOD Record, 1993