Abstract
This paper depicts Israel Aircraft Industry's (IAI's) real‐life experience in measuring and optimizing system's quality costs and project duration associated with upgrading a transport helicopter's avionic system. Quality costs are composed of investments in systems appraisal as well as risk impacts and systems' failures costs. Our objective was to measure systems quality cost/times in a typical development project as well as suggest ways to optimize it in order to meet IAI's business objectives. Relevant data were gathered from historical records, a real‐life “pilot project,” and domain experts. This data were aggregated and utilized to calibrate a Verification, Validation, and Testing (VVT) cost/time model for estimating key quality components. Optimized VVT strategies were generated intending to minimize the quality costs and/or project duration. Study findings indicate that over 60% of development cost was spent on quality. In addition, about 10% of the total development effort was spent on the Definition phase and, within that phase, only 1%–2% of the total development cost was invested in quality. Finally, the results of the optimization runs indicated a practical savings of about 15% in quality cost. Another optimized VVT strategy yielded over 20% improvement in project duration. Clearly our current VVT strategy is not optimal. First we should increase significantly the level of VVT performance during the Definition and Design phases. In addition, we should reduce the performance level of certain VVT activities which are not cost effective. © 2006 Wiley Periodicals, Inc. Syst Eng 9: 259–280, 2006Keywords
This publication has 21 references indexed in Scilit:
- Optimizing VVT strategies: a decomposition approachJournal of the Operational Research Society, 2006
- Lean product development flowSystems Engineering, 2004
- A methodology for modeling VVT risks and costsSystems Engineering, 2003
- Risk Filtering, Ranking, and Management Framework Using Hierarchical Holographic ModelingRisk Analysis, 2002
- Top 10 list [software development]Computer, 2001
- COST OF SOFTWARE QUALITY: A MEANS OF PROMOTING SOFTWARE PROCESS IMPROVEMENTQuality Engineering, 1998
- Exploratory Evidence on the Behavior of Quality CostsOperations Research, 1996
- Dual programming approach to software testingSoftware Quality Journal, 1994
- Eliciting probabilities from experts in complex technical problemsIEEE Transactions on Engineering Management, 1991
- General Systems Theory—The Skeleton of ScienceManagement Science, 1956