Selecting an Effective ESS Installation Location From the Perspective of Reactive Power
Author:
Open Access
- 13 March 2020
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 8, 51945-51953
Abstract
When an entire power system blacks out, the system operator uses a self-starting generator to initiate the recovery procedure that starts the priority generator using a transmission line. Because most selfstarting generators are pumped storage generators, they are located at a distance from the priority generators. This results in long transmission lines that can cause overvoltage during the recovery process through the line charging effect. Herein, the above issue is resolved by replacing the self-starting generator with an energy storage system (ESS) to reduce the possibility of overvoltage generation. The transmission line is shortened by moving the ESS closer to the priority generator, thus utilizing its flexible installation feature: an ESS has no location constraints for installation. In addition, this study determines an effective location for the ESS to minimize the reactive power requirements: moving the ESS closer to the priority generator reduces the required reactive power. Thus, the capacity of the power conditioning system can be reduced, which is advantageous in terms of cost-effectiveness.Keywords
Funding Information
- Korea Electric Power Corporation (R18XA06-65)
- National Research Foundation of Korea (2017R1D1A1B03034460)
This publication has 31 references indexed in Scilit:
- Coordinated Control Strategy of Wind Turbine Generator and Energy Storage Equipment for Frequency SupportIEEE Transactions on Industry Applications, 2015
- Overview of current development in electrical energy storage technologies and the application potential in power system operationApplied Energy, 2015
- Methodology for the economic optimisation of energy storage systems for frequency support in wind power plantsApplied Energy, 2015
- Spatiotemporal Modeling of Wind Generation for Optimal Energy Storage SizingIEEE Transactions on Sustainable Energy, 2014
- An Ultracapacitor Integrated Power Conditioner for Intermittency Smoothing and Improving Power Quality of Distribution GridIEEE Transactions on Sustainable Energy, 2014
- An Integrated Active Power Filter–Ultracapacitor Design to Provide Intermittency Smoothing and Reactive Power Support to the Distribution GridIEEE Transactions on Sustainable Energy, 2014
- Optimal sizing and control strategy of isolated grid with wind power and energy storage systemEnergy Conversion and Management, 2014
- A new approach for optimal sizing of battery energy storage system for primary frequency control of islanded MicrogridInternational Journal of Electrical Power & Energy Systems, 2014
- Reactive reserve-based contingency constrained optimal power flow (RCCOPF) for enhancement of voltage stability marginsIEEE Transactions on Power Systems, 2003
- A study on determination of interface flow limits in the KEPCO system using modified continuation power flow (MCPF)IEEE Transactions on Power Systems, 2002